German civil engineer.
Biographical Information
Name: | Ulrich Finsterwalder |
---|---|
Born on | 25 December 1897 in Munich, Bavaria, Germany, Europe |
Deceased on | 5 December 1988 in Munich, Bavaria, Germany, Europe |
Collaborator of | Gerd Lohmer |
Place(s) of activity: | |
1923 | Graduates from the Technical School in Munich, works with Franz Dischinger at Dyckerhoff & Widmann AG. |
1929 | Competition design for the Dreirosen Bridge in Basel as a prestressed cantilever bridge |
1930 | Doctorate, Thesis subject: differential equations for the deflection of barrel shells |
1933 | Director of the main construction office at Dyckerhoff & Widmann |
1950 | Balduin Bridge over the Lahn River, first try in prestressed cantilever construction |
1970 | Freyssinet Medal of the Féderation internationale de la Précontrainte (FIP) |
Structures and Projects
Participation in the following structures & large-scale projects:
designer
- Balduinstein Bridge - Dyckerhoff & Widmann AG
- Black Forest Hall - Dyckerhoff & Widmann AG
- Dyckerhoff Bridge - Dyckerhoff & Widmann AG
- Eisenbahnbrücken A13 - Dyckerhoff & Widmann AG
- Elz Viaduct - Dyckerhoff & Widmann AG
- Europe Bridge - Dyckerhoff & Widmann AG
- Gänstor Bridge - Dyckerhoff & Widmann AG
- Heidelberg Central Station Platform Roofs - Dyckerhoff & Widmann AG
- Horrem Bridge - Dyckerhoff & Widmann AG
- Konrad Adenauer Bridge
- Mangfall Bridge - Dyckerhoff & Widmann AG
- Werneuchen Aircraft Hangar - Dyckerhoff & Widmann AG
engineer
- Frankfurt Wholesale Market Hall - Dyckerhoff & Widmann AG
- Severin Bridge - Dyckerhoff & Widmann AG
- Zoobrücke - Dyckerhoff & Widmann AG
structural engineer
- Bendorf Bridge - Dyckerhoff & Widmann AG
- Grossmarkthalle Köln - Dyckerhoff & Widmann AG
- Großmarkthallen Hamburg - Dyckerhoff & Widmann AG
- Illerbrücke Egelsee (A7) - Dyckerhoff & Widmann AG
- Karlssteg - Dyckerhoff & Widmann AG
- Mangfall Bridge - Dyckerhoff & Widmann AG
- New Hoechst Bridge - Dyckerhoff & Widmann AG
- Nibelungenbrücke - Dyckerhoff & Widmann AG
- Nuremberg-Fürth Elevated Metro Bridge - Dyckerhoff & Widmann AG
- Unkelstein Viaduct - Dyckerhoff & Widmann AG
Bibliography
- Die Anwendung von hochwertigem Stahl im Eisenbeton. In: IABSE Publications, v. 5 ( 1937- 1938). (1937):
- Cylindrical shell structures. Presented at: Zweiter Kongress der IVBH = Deuxième Congrès de l'AIPC = Second Congress of IABSE, Berlin-München 1.-11. Oktober 1936. (1936):
- Dywidag-Spannbeton und freier Vorbau: Weiterentwicklung und Erfahrungen. Presented at: Fifth Congress of IABSE = Cinquième Congrès de l'AIPC = Fünfter Kongress der IVBH, Lisboa-Porto, 25 de Junho - 2 de Julho 1956. (1956):
- La construcción de puentes de hormigón pretensado. Nuevas posibilidades. In: Hormigón y acero, v. 16, n. 74 (1st Quarter 1965), pp. 15-19. (1965):
- Die Donaubrücke beim Gänstor in Ulm. In: Bauingenieur, v. 26, n. 10 (October 1951), pp. 289-292. (1951):
Relevant Websites
Relevant Publications
- L'art de l'ingénieur. constructeur, entrepeneur, inventeur. Éditions du Centre Georges Pompidou, Paris (France), pp. 185-6. (1997):
- Der Bauingenieur. Geschichte eines Berufes. Verlag für Bauwesen, Berlin (Germany), pp. 216. (1994):
- Bauingenieure und ihr Werk. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), pp. 145-146. (2004):
- Erinnerungen an Ulrich Finsterwalder (1897 - 1988). In: Bautechnik, v. 74, n. 12 (December 1997), pp. 857-864. (1997):
- Festschrift Ulrich Finsterwalder - 50 Jahre für Dywidag. Spannbeton, Spannverfahren, Gewi-Stahl, Fertigteile im Hochbau, Brückenbau, Leichtbeton, Kernkraftwerke, Tiefbau, Eisenbahnoberbau, Großhallenbau. Dyckerhoff & Widmann, Karlsruhe (Germany), pp. 344. (1973):
- About this
data sheet - Person-ID
1000011 - Published on:
29/12/1998 - Last updated on:
22/07/2014