Name in local language: | Europabrücke |
---|---|
Beginning of works: | 1 August 1952 |
Completion: | 1954 |
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Koblenz, Rhineland-Palatinate, Germany |
---|---|
Crosses: |
|
Next to: |
Europe Bridge (1974)
|
Replaces: |
Adolf Hitler Bridge (1934)
|
Coordinates: | 50° 21' 51.47" N 7° 35' 16.38" E |
Technical Information
Dimensions
total length | 359.39 m | |
span lengths | 101.47 m - 113.90 m - 122.85 m | |
number of spans | 3 | |
abutments | number | 2 |
deck | deck depth | 2.50 - 7.00 m |
on-center distance between girders | 5.50 m | |
deck slab thickness | 0.30 m | |
width of box | 4.52 m | |
number of longitudinal girders | 2 | |
piers | number | 2 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Subcontractor
Initial construction
Design
-
Dyckerhoff & Widmann AG
- Ulrich Finsterwalder (designer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les ponts en béton précontraint de Worms, sur le Rhin, et de Coblence, sur la Moselle. In: La Technique des Travaux, v. 32, n. 3-4 (March 1956), pp. 126-129. (1956):
- About this
data sheet - Structure-ID
20030359 - Published on:
20/08/2007 - Last updated on:
07/08/2023