Structures and Large-Scale Projects
The engineering structures included in Structurae are first and foremost those which are necessary to establish lines of communication or transport, such as bridges, tunnels, dams, etc. But Structurae is also interested in those structures in which the civil or structural engineering aspect is very significant be it through the structure itself or for the way it was built.
Structure Jubilees and Anniversaries
-
280 yearsRavenna Cathedral
-
160 yearsPuente Colgante de Valladolid
-
130 yearsAgios Minas Cathedral
-
130 yearsEvreux Town Hall
-
110 yearsRoebling Auditorium
-
110 yearsTheatre Circo
-
100 yearsMeiendorfer Weg Metro Station
-
100 yearsMellah-Slimane Footbridge
-
90 yearsArbatskaya Metro Station
-
90 yearsGoncourt Metro Station
-
90 yearsJourdain Metro Station
-
90 yearsParis Métro Line 11
-
90 yearsPyrénées Metro Station
-
90 yearsRambuteau Metro Station
-
90 yearsSchaan–Buchs Rail Bridge
-
-
90 yearsTélégraphe Metro Station
-
90 yearsThompson's Bridge
-
70 yearsAngus L. Macdonald Bridge
-
70 yearsCentennial Bridge
-
50 yearsBande Nere Metro Station
-
50 yearsFruängen Metro Station
-
50 yearsInganni Metro Station
-
50 yearsVyborgskaya Metro Station
-
40 yearsBarlow/Max Bell CTrain Station
-
40 yearsBlue Line (CTrain)
-
-
-
-
40 yearsCascina Antonietta Metro Station
-
40 yearsFranklin CTrain Station
-
40 yearsGessate Metro Station
-
40 yearsRomolo Metro Station
-
40 yearsRundle CTrain Station
-
40 yearsSakura Bridge
-
40 yearsVictoria Dam
-
40 yearsWhitehorn CTrain Station
-
40 yearsZoo CTrain Station
Today's Anniversaries
- Chemnitz Tramway 145 years
- Mattelift 128 years
- Broadway Bridge 112 years
- Miltenberg Bridge 75 years
- Kaliningrad Regional Drama Theatre 65 years
- Zaporizhzhia State Circus 53 years
- Lesnaya Metro Station 50 years
- Vyborgskaya Metro Station 50 years
- Central LRT Station 47 years
- Churchill LRT Station 47 years
- İzmir Metro 25 years
- Denver Millennium Footbridge 23 years
- Untermhaus Footbridge 18 years
- Waterwolf Tunnel 12 years
- 38th and Blake Station 9 years
- Eiganes Tunnel 5 years
- Hundvaag Tunnel 5 years
- Königsstuhl Observation Deck 2 years