General Information
Name in local language: | Donaubrücke Steyregg |
---|---|
Beginning of works: | 1976 |
Completion: | September 1979 |
Status: | in use |
Project Type
Structure: |
Two-span single-pylon cable-stayed bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Linz, Upper Austria, Austria Steyregg, Upper Austria, Austria |
---|---|
Crosses: |
|
Next to: |
Steyregg Railroad Bridge (1925)
|
Coordinates: | 48° 17' 13" N 14° 20' 34" E |
Technical Information
Dimensions
total length | 453.6 m | |
span lengths | 3 x 80.60 m - 161.20 m - 50.60 m | |
number of spans | 5 | |
horizontal navigation clearance | 161.2 m | |
deck | deck depth | 4.20 m |
deck width | 24.80 m | |
on-center distance between girders | 6.4 m | |
deck slab thickness | 0.20 - 0.35 m | |
number of longitudinal girders | 4 - 5 | |
pylon | pylon height | 44.00 m |
Quantities
structural steel | 3 000 t |
Materials
cables |
steel
|
---|---|
pylon |
steel
|
deck slab |
prestressed concrete
|
girders |
steel
|
Excerpt from Wikipedia
The Steyregger Bridge is a concrete bridge that crosses the Danube in the Upper Austrian capital of Linz.
Location and history
The Steyregger Bridge is located immediately north/upstream of the older Steyregg railway bridge. On the Steyregger Ufer the distance between the centers of the bridge is around 75 meters, on the Linzer Ufer it is only 30 meters.
It connects Linz in the west with Steyregg in the east of the Danube River, which flows south-southeast. It is part of Donau-Straße (B 3) and has 2×2 lanes that are separated from each other and from the side sidewalks and cycle paths by guardrails. On the Linzer Ufer, the B 3 separates the operating areas of the Linz Chemical Park from the voestalpine Hütten- und Stahlwerke.
It was opened on September 12, 1979, after three years of construction. The first plans to build the road bridge were already in 1914.
Construction
The 453.6 m long and 254.86 m wide bridge has an A-shaped, 44 m high pylon, which is articulated on the cantilever arms of the pylon cross beam on the stream pillar. Its head is braced to the carriageway support with two cables on each side. It has five openings with spans of 50.6 + 161.0 + 3 × 80.6 m, with which it bridges the edge of the bank of the industrial area, the main channel of the Danube, its edge areas and the flood zone.
Its' bridge deck is a composite construction made of four steel solid wall girders and a 20 cm thick reinforced concrete slab.
The bridge was built on behalf of the Upper Austrian state government in a joint venture between the construction companies Hamberger Baugesellschaft, Mayreder Krauss & Co and Porr AG in collaboration with VOEST-Alpine. The planning and construction management was carried out by Waagner-Biro.
Text imported from Wikipedia article "Steyregger Bridge" and modified on October 24, 2024 according to the CC-BY-SA 4.0 International license.
Participants
Relevant Web Sites
Relevant Publications
- Schrägseilbrücken. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), pp. 28. (1986):
- Die Steyregger Donaubrücke in Linz. In: IABSE Structures, v. 4, n. 4 ( 1980). (1980):
- About this
data sheet - Structure-ID
20001102 - Published on:
07/10/2000 - Last updated on:
23/10/2024