General Information
Name in local language: | Europabrücke |
---|---|
Beginning of works: | 9 November 1972 |
Completion: | 17 December 1974 |
Status: | in use |
Project Type
Structure: |
Haunched girder bridge Single-cell box girder bridge |
---|---|
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Balanced cantilever method |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Koblenz, Rhineland-Palatinate, Germany |
---|---|
Crosses: |
|
Next to: |
Europe Bridge (1954)
|
Coordinates: | 50° 21' 51.36" N 7° 35' 17.20" E |
Technical Information
Dimensions
total length | ca. 400 m | |
span lengths | 105 m - 112 m -128 m | |
number of lanes | 4 | |
roadway / carriageway width | 4 x 3.25 m | |
walkway width | 2.50 m | |
abutments | number | 2 |
deck | number of longitudinal girders | 1 |
piers | number | 2 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20086281 - Published on:
07/08/2023 - Last updated on:
08/08/2023