General Information
Name in local language: | Lahnbrücke bei Balduinstein |
---|---|
Beginning of works: | 1950 |
Completion: | 25 April 1951 |
Status: | to be demolished |
Project Type
Structure: |
Double T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Balduinstein, Rhein-Lahn-Kreis, Rhineland-Palatinate, Germany |
---|---|
Address: | Lahnstraße |
Crosses: |
|
Coordinates: | 50° 20' 46.40" N 7° 58' 3.71" E |
Technical Information
Dimensions
height | 9 m | |
span | 62 m | |
number of spans | 1 | |
number of lanes | 2 |
Materials
deck |
prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
Notes
First bridge built of prestressed concrete using the free cantilever method.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Entwicklung des freien Vorbaus von Spannbetonbrücken. In: Bauingenieur, v. 40, n. 3 (March 1965), pp. 85-91. (1965):
- Große Konstrukteure 1. Freyssinet, Maillart, Dischinger, Finsterwalder. Verlag Ullstein GmbH, Berlin (Germany), pp. 240-242. (1966):
- Tierra sobre el agua. Visión histórica universal de los puentes. Colegio de Ingenieros de Caminos, Canales y Puertos, Madrid (Spain), pp. 394. (1999):
- About this
data sheet - Structure-ID
20001426 - Published on:
09/04/2001 - Last updated on:
15/08/2023