General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
Location
Location: |
Worms, Rhineland-Palatinate, Germany Lampertheim, Bergstraße, Hesse, Germany |
---|---|
Crosses: |
|
Next to: |
Nibelungenbrücke (2008)
|
Replaces: |
Ernst Ludwig Bridge (1900)
|
Coordinates: | 49° 37' 52.77" N 8° 22' 47.51" E |
Technical Information
Dimensions
deck width | 14.00 m | |
bridge surface | 10 677 m² | |
approach viaduct Hessen | ||
---|---|---|
span lengths | 43-47 m - 36.50 m - 35.40 m - 34.15 m - 31.00 m - 29.70 m - 28.55 m - 25.70 m - 22.35 m | |
number of spans | 9 | |
approach viaduct Worms | ||
span lengths | 29.75 m - 33.50 m - 45.85 m - 28.25 m | |
number of spans | 4 | |
main bridge | ||
main span | 114.20 m | |
total length | ca. 320 m | |
span lengths | 101 m - 114.20 m - 101 m | |
number of spans | 3 |
Quantities
Renovation | ||
---|---|---|
concrete volume | 1 700 m³ | |
prestressing steel | 28 t | |
reinforcing steel | 298 t |
Design Loads
live load | Brückenklasse 60 | |
design code(s) | DIN 1072 |
Cost
Renovation | ||
---|---|---|
cost of construction | Euro 13 600 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Initial construction (1951-1953)
Owner
Architecture
- Gerd Lohmer (architect)
Structural engineering
-
Dyckerhoff & Widmann AG
- Ulrich Finsterwalder (structural engineer)
Construction
Renovation (2010-2013)
Owner
Client
Original design
Design consultants
- Jean-Jacques Zimmermann (design consultant)
Structural engineering
Checking engineering
- Tilman Zichner (checking engineer)
Contractor
Site supervision
Relevant Web Sites
Relevant Publications
- 100 Jahre zusätzliche Lebensdauer für die Nibelungenbrücke Worms! Wie kann das gelingen?. Presented at: 28. Brandenburgischer Bauingenieurtag (BBIT2024) "Ressourcen- und energieeffiziente Konstruktionen", 2. Mai 2024, BTU Cottbus-Senftenberg, Cottbus, pp. 25-40. (2024):
- Algunos aspectos del proyecto de grandes puentes. In: Hormigón pretensado, v. 14, n. 66 (1st Quarter 1963), pp. 12-22. (1963):
- Brücken und Tunnel der Bundesfernstraßen 2014. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2014, pp. 89-101.
- Ertüchtigung der Nibelungenbrücke Worms. In: Beton- und Stahlbetonbau, v. 110, n. 2 (February 2015), pp. 113-130. (2015):
- Festschrift zur Einweihung und Verkehrsübergabe der neuen Straßenbrücke über den Rhein am 30. April 1953. 1953.
- About this
data sheet - Structure-ID
20001157 - Published on:
10/12/2000 - Last updated on:
05/02/2016