General Information
Other name(s): | Rheinbrücke Worms |
---|---|
Beginning of works: | 4 May 2005 |
Completion: | 12 September 2008 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Worms, Rhineland-Palatinate, Germany Lampertheim, Bergstraße, Hesse, Germany |
---|---|
Crosses: |
|
Carries: |
|
Next to: |
Nibelungenbrücke (1953)
|
Coordinates: | 49° 37' 51.79" N 8° 22' 48.09" E |
Technical Information
Dimensions
main span | 114.20 m | |
total length | 744.30 m | |
span lengths | 29.75 m - 33.50 m - 37.10 m - 37.00 m - 101.65 m - 114.20 m - 107.00 m - 41.30 m - 36.00 m - 35.40 m - 34.15 m - 31.00 m - 29.00 m - 28.55 m - 25.70 m - 22.35 m | |
number of spans | 16 | |
bridge surface | 10.050 m² | |
bridge surface | 10 494.1 m² | |
deck | deck width | 13.50 m / 16.75 m |
piles | total length | 4 400 m |
main bridge | ||
---|---|---|
length | 321.60 m |
Quantities
deck | prestressing steel | 480 t |
reinforcing steel | 1 420 t | |
deck of approach viaducts | concrete volume | 5 700 t |
deck of main bridge | concrete volume | 4 200 m³ |
piles | concrete volume | 5 000 m³ |
reinforcing steel | 430 t | |
substructure | concrete volume | 7 600 m³ |
reinforcing steel | 640 t |
Design Loads
live load | DIN FB 101 |
Cost
cost of construction | ca. Euro 13 500 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Design
- BUNG Ingenieure AG
- Hubert Verheyen (designer)
Architecture
Structural engineering
Geotechnical/geological experts
Checking engineering
- Hubert Verheyen (checking engineer)
- Manfred Keuser (checking engineer)
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2009. Deutscher Bundes-Verlag, Cologne (Germany), ISBN 978-3-935064-61-3, 2009, pp. 25-37.
- Der Entwurf der Neuen Nibelungenbrücke über den Rhein bei Worms. In: Beton- und Stahlbetonbau, v. 104, n. 3 (March 2009), pp. 175-181. (2009):
- Im Freivorbau über den Rhein – Die Neue Nibelungenbrücke Worms. Presented at: 17. Dresdner Brückenbausymposium, Dresden, 13. März 2007. (2007):
- About this
data sheet - Structure-ID
20006046 - Published on:
09/10/2002 - Last updated on:
07/05/2024