0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Schwarzwaldhalle
Beginning of works: 1953
Completion: 19 August 1953
Duration of works: 8 months
Status: in use

Project Type

Function / usage: Multipurpose hall
Structure: Shell
Material: Prestressed concrete structure

Location

Location: , ,
Coordinates: 49° 0' 6.19" N    8° 24' 4.25" E
Show coordinates on a map

Technical Information

Dimensions

width 48.60 m
length 73.50 m
seats 4500

Materials

shell reinforced concrete

Participants

Owner
Design
Architecture
Structural engineering
Construction

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000137
  • Published on:
    16/04/1999
  • Last updated on:
    07/10/2015
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine