0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Neue Werksbrücke der Farbwerke Hoechst
Beginning of works: 1970
Completion: 15 December 1972
Status: in use

Project Type

Location

Location: , ,
, , ,
Crosses:
  • Main River
Coordinates: 50° 4' 49.94" N    8° 31' 23.01" E
Show coordinates on a map

Technical Information

Dimensions

main span 148.23 m
total length 294.31 m
span lengths 16.91 m - 25.65 m - 29.00 m - 39.35 m - 148.23 m - 26.17 m
clearance 9.22 m
number of spans 6
number of tracks 1
number of lanes 2 x 2
vertical navigation clearance 9.22 m
abutments number 2
deck deck width 30.95 m
piers number 5
pylon number 1

Cost

cost of construction ca. German Mark 40 000 000

Materials

pylon reinforced concrete
deck prestressed concrete
abutments reinforced concrete

Chronology

15 December 1972

Inauguration

Participants

Architecture
Structural engineering
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000432
  • Published on:
    08/10/1999
  • Last updated on:
    07/11/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine