0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Ligne à grande vitesse (LGV) Méditerranée
Official designation: Ligne nouvelle 5 (LN 5)
Beginning of works: 1995
Completion: 7 June 2001
Status: in use

Project Type

Function / usage: High-speed rail line

Location

km Name
10.980
15.100
18.380
495.460
522.550
531
531.620
570.210
589.200
590.300
597.860
608.100
608.640
609.300
622.400
625.160
636.200
636.940
646.600
650.560
653.800
669
670.440
673.993
688.200
699.140
702.280
703.810
704.210
709.620
Show coordinates on a map

Technical Information

Dimensions

total length 250 km
number of new stations 3
number of structures 483
length of viaducts 17 155 m
underground length 12 768 m

Quantities

ballast 2 400 000 t
number of traverses 850 000

Design Loads

design speed 300 km/h

Cost

cost of construction French Franc 24 200 000 000

Chronology

January 1989

Beginning of studies.

January 1991

The Transport Ministry decides on the track alignment and begins studies for the inquiry for the public inserts of the project.

23 September 1993

Interdepartmental committee confirms the construction of the line.

31 May 1994

Project declared of public interest.

May 1999

First tracks laid.

10 June 2001

Official opening to regular traffic.

Notes

Continuation of the TGV Paris-South East and TGV Rhône south of Lyons.

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    10000002
  • Published on:
    18/05/1999
  • Last updated on:
    12/01/2023