General Information
Status: | in use |
---|
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Technical Information
Dimensions
total length | 155.40 m | |
span lengths | 29.10 m - 30.50 m - 25.80 m - 2 x 25.00 m - 20.00 m | |
number of spans | 6 | |
deck slab | width | 13.060 m |
girders | girder depth | 1 450 mm |
Quantities
reinforcing steel | 450 t | |
deck | structural steel | 500 t [S355K2G3 N / NL] |
deck slab | concrete volume | 700 m³ |
substructure | concrete volume | 3 800 m³ |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Franchissement de la RN 580 et de la RN 100. In: Bulletin ponts métalliques, n. 19 ( 1999), pp. 135-140. (1999):
- About this
data sheet - Structure-ID
20016484 - Published on:
02/06/2005 - Last updated on:
05/02/2016