General Information
Status: | in use |
---|
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
La Roche-sur-Grane, Drôme (26), Auvergne-Rhône-Alpes, France |
---|---|
Part of: |
|
Coordinates: | 44° 41' 23.27" N 4° 56' 22.09" E |
Technical Information
Dimensions
main span | 53 m | |
total length | 947 m | |
height above valley floor or water | 60 m | |
deck | deck depth | 4.50 m |
deck width | 12.67 m |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Structural engineering
Geotechnical engineering
Contractor
Foundations
(role unknown)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Des Records et des Hommes. TGV Méditerranée. Terre du Sud, pp. 68-71. (1999):
- Lot 1B - Le viaduc de la Grenette. In: Travaux, n. 742 (May 1998), pp. 42-46. (1998):
- The main bridges of the high speed line HSL Méditerranée. Presented at: fib Symposium 2004, 26-28 April 2004, Avignon, pp. 65-82. (2004):
- Viaduc de la Grenette. In: Formes et Structures, n. 127, pp. 37. :
- Le viaduc de la Grenette sur la ligne nouvelle du TGV Méditerranée. The Grenette viaduct on the new mediterranean high-spedd train line. Presented at: La Technique française du béton, XIIIe congrès de la FIB, Amsterdam 1998, pp. 383. (1998):
- About this
data sheet - Structure-ID
20000402 - Published on:
15/09/1999 - Last updated on:
05/02/2016