Incremental launching
Structures in this category
- entry with pictures
- new entry (30 days)
- updated entry (14 days)
# | Name | Country |
---|---|---|
1 | A1 Reno River Bridge | Italy |
2 | A3/A9 Junction Overpass | Germany |
3 | A43 Overpass | France |
4 | A5 Ceiriog Viaduct | Great Britain |
5 | Abéou Aqueduct | France |
6 | Acueducto canal Garrigues-Segarra | Spain |
7 | Ada Bridge | Serbia |
8 | Aich Valley Bridge | Germany |
9 | Aiguilly Bridge | France |
10 | Albetal Viaduct | Germany |
List of all structures in this category
Media
Subcategories
Literature
- Analysis of curved incrementally launched box concrete bridges using the Transfer Matrix Method. In: Bridge Structures, v. 3, n. 3-4 (September 2007), pp. 165-181. (2007):
- The application of virtual reality technology in the construction of bridge: The cantilever and incremental launching methods. In: Automation in Construction, v. 37 (January 2014), pp. 58-67. (2014):
- Brückenbau im Taktschiebeverfahren. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany). (1999):
- Brückenbau mit dem Taktschiebeverfahren. Eine wirtschaftliche Bauart aus der Sicht einer Bauunternehmung. In: Spannbetonbau in der Bundesrepublik Deutschland 1978-1982. Deutscher Beton-Verein e.V. / Deutsche Gruppe International Spannbeton-Verband (FIP), Berlin (Germany), pp. 10-14. (1982):
- (2016): Challenges in seismic design of incrementally launched bridges of Northern Marmara Motorway. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 1023-1030.