General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge Experimental / prototype bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Single-cell box girder bridge |
Construction method: |
Incremental launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nürnberger Land, Bavaria, Germany |
---|---|
Coordinates: | 49° 27' 38.50" N 11° 14' 8.34" E |
Technical Information
Dimensions
total length | 155.75 m | |
span lengths | 37.75 m - 45.00 m - 44.00 m - 29.00 m | |
deck width | 15.70 m | |
number of spans | 4 | |
bridge surface | 2 445 m² | |
number of lanes | 2 | |
pier 30 | width | 3.50 m |
thickness | 2.00 m | |
piers 20 & 40 | width | 8.00 m |
thickness | 1.80 m | |
piles | diameter | 1.20 m |
superstructure | girder depth | 2.60 m |
roadway / carriageway width | 12.00 m | |
superelevation | 5.5 % |
Quantities
substructure | concrete volume | 1 930 m³ |
reinforcing steel | 252 t | |
superstructure | concrete volume | 2 345 m³ |
prestressing steel | 102 t | |
reinforcing steel | 505 t |
Design Loads
design code(s) | DIN EN 1991-2/NA |
Cost
cost of construction | Euro 15 000 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
(C 35/45)
reinforced concrete (C 45/55) |
piles |
reinforced concrete
|
abutments |
reinforced concrete
(C 30/37)
|
Participants
Owner
Client
Design
Structural engineering
Soil investigation report
Checking engineering
- Dietrich Oehmke (checking engineer)
Contractor
Construction management
Site supervision
Relevant Web Sites
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2018. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2018, pp. 7-21.
- intelligente Brücke im digitalen Testfeld Autobahn. In: Bautechnik, v. 94, n. 7 (July 2017), pp. 438-444. (2017):
- About this
data sheet - Structure-ID
20077331 - Published on:
30/04/2019 - Last updated on:
30/04/2019