General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Single-cell box girder bridge Multi-span continuous girder bridge |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Incremental launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Neuenstadt am Kocher, Heilbronn (Kreis), Baden-Württemberg, Germany Hardthausen am Kocher, Heilbronn (Kreis), Baden-Württemberg, Germany |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Carries: |
A 81 Motorway (Germany)
|
Coordinates: | 49° 14' 27.49" N 9° 20' 53.38" E |
Technical Information
Dimensions
height | 33 m | |
total length | 478 m | |
number of spans | 9 | |
number of lanes | 2 x 2 | |
abutments | number | 2 |
piers | number | 2 x 8 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
Spherical Segment Bearings in lieu of Roller Bearings
As part of the rehabilitation of the A 81 federal motorway at the Kocher Viaduct, MAURER replaces the old roller bearings made of stainless steel with modern spherical segment bearings. The patented bearing type was developed precisely f ... [more]
Participants
Initial construction (1969-1971)
Owner
Client
Bearing replacement (2023-2024)
Owner
Client
Contractor
Bearings
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20089253 - Published on:
02/09/2024 - Last updated on:
04/09/2024