General Information
Project Type
Structure: |
Tied-arch bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Material: |
Steel bridge |
Location
Location: |
Bonpas, Avignon, Vaucluse (84), Provence-Alpes-Côte d'Azur, France |
---|---|
Crosses: |
|
Part of: |
|
Coordinates: | 43° 53' 34" N 4° 54' 56" E |
Technical Information
Dimensions
main span | 124 m | |
total length | 190 m |
Quantities
structural steel | 2 600 t |
Materials
substructure |
reinforced concrete
|
---|---|
arch |
steel
|
Chronology
3 June 1998 | The arch is pushed into place. |
---|
Participants
Owner
Client
Architecture
- AR-C
- Jean-Pierre Duval (architect)
Structural engineering
Main contractor
Steel construction
Launching
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le bow-string de Bonpas su le péage de l'A7 à l'échangeur d'Avignon. In: Bulletin ponts métalliques, n. 19 ( 1999), pp. 141-160. (1999):
- Des Records et des Hommes. TGV Méditerranée. Terre du Sud, pp. 110-111. (1999):
- Les viaducs ferroviaires de la ligne à grande vitesse TGV Méditerranée. In: Ouvrages d'art, n. 30 (August 1998), pp. 3-12. (1998):
- Vom Einfluß hoher Geschwindigkeiten auf den Entwurf von Eisenbahnbrücken am Beispiel der Stahlbrücken auf der Hochgeschwindigkeitsstrecke (HGS) des TGV Méditerrannée. In: Stahlbau, v. 67, n. 8 (August 1998), pp. 652-658. (1998):
- About this
data sheet - Structure-ID
20000415 - Published on:
18/09/1999 - Last updated on:
05/02/2016