0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Bridge over the A7 Toll Gate at Bonpas

General Information

Other name(s): Bowstring d'Avignon-Sud
Beginning of works: 1997
Completion: 1998
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: High-speed rail bridge
Material: Steel bridge

Location

Location: , , , ,
Crosses:
  • Autoroute A7
Part of:
Coordinates: 43° 53' 34" N    4° 54' 56" E
Show coordinates on a map

Technical Information

Dimensions

main span 124 m
total length 190 m

Quantities

structural steel 2 600 t

Materials

substructure reinforced concrete
arch steel

Chronology

3 June 1998

The arch is pushed into place.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000415
  • Published on:
    18/09/1999
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine