General Information
Status: | in use |
---|
Project Type
Function / usage: |
Motorway / Freeway / Interstate |
---|
Location
km | Name |
7.800 |
Technical Information
Dimensions
total length | 257 km |
Participants
Relevant Web Sites
Relevant Publications
- Instandsetzung von Großbrücken in Hessen. Sofortmaßnahmen und Konzepte für die Sauerlandlinie. In: Brückenbau, v. 2, n. 4 ( 2010), pp. 12-15. (2010):
- Strengthening the Major Bridges on the A45 Motorway Recalculation – Immediate Measures – Reinforcement Concepts. Recalculation -Immediate Measures – Reinforcement Concepts. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- About this
data sheet - Structure-ID
10000280 - Published on:
20/04/2003 - Last updated on:
20/01/2022