General Information
Name in local language: | Talbrücke Münchholzhausen |
---|---|
Completion: | 1966 |
Status: | demolished (2020) |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Construction method: |
Movable Scaffolding System |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wetzlar, Lahn-Dill-Kreis, Hesse, Germany |
---|---|
Carries: |
|
Part of: | |
Replaced by: |
Münchholzhausen Viaduct (2019)
|
Coordinates: | 50° 32' 49.63" N 8° 34' 7.56" E |
Technical Information
Dimensions
length | ca. 480.00 m | |
span lengths | 15 x 32 m | |
number of spans | 15 |
Design Loads
live load | Brückenklasse 60 | |
design code(s) | DIN 1072 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Initial construction
Owner
Client
Demolition
Owner
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2020. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2020, pp. 8.
- About this
data sheet - Structure-ID
20021382 - Published on:
05/05/2006 - Last updated on:
06/04/2021