0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Talbrücke Münchholzhausen
Beginning of works: October 2014
Completion: May 2019
Status: in use

Project Type

Location

Location: , , ,
Carries:
  • Autobahn A45
Replaces: Münchholzhausen Viaduct (1966)
Coordinates: 50° 32' 49.63" N    8° 34' 7.56" E
Show coordinates on a map

Technical Information

Dimensions

total length 485.00 m
span lengths 32.00 m - 34.00 m - 36.00 m - 45.00 m - 51.00 m - 45.00 m - 36.00 m - 3 x 34.00 m - 36.00 m - 38.00 m - 30.00 m
deck width 36.10 m
number of spans 13
bridge surface 17 508 m²
number of lanes 2 x 3
piers height 8.00 - 17.70 m
pile caps thickness A10: 1.40 m
A20-40: 1.70 m
A50-60: 2.00 m
A70-130: 1.70 m
piles diameter 1.20 m

Quantities

substructure concrete volume 13 500 m³
reinforcing steel 1 500 t
superstructure structural steel 4 000 t
concrete volume 7 300 m³
reinforcing steel 2 000 t

Design Loads

live load LM 1 (DIN EN 1991-2)

Materials

piers reinforced concrete (C 35/45)
piles reinforced concrete (C 30/37)
deck slab reinforced concrete
abutments reinforced concrete (C 30/37)
girders steel (S 355 J2+N)
pile caps reinforced concrete (C 35/45)

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20080943
  • Published on:
    06/04/2021
  • Last updated on:
    06/04/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine