General Information
Name in local language: | Mainbrücke Mainflingen |
---|---|
Beginning of works: | 1976 |
Completion: | 1978 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge Box girder bridge |
Construction method: |
Incremental launching with temporary cable-stays |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Mainflingen, Mainhausen, Offenbach (Kreis), Hesse, Germany Kleinostheim, Aschaffenburg (Kreis), Bavaria, Germany |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Will be replaced by: |
Mainflingen Bridge (A 45)
|
Coordinates: | 50° 0' 50" N 9° 2' 8.58" E |
Technical Information
Dimensions
length | 449.1 m | |
deck width | 2 x 19.25 m | |
approach viaduct | ||
---|---|---|
span lengths | 3 x 42.09 m - 43.57 m | |
number of spans | 4 | |
piers | width | 1.40 m / 2.10 m |
thickness | 2.70 m / 4.60 m | |
superstructure | girder depth | 3.00 m |
main bridge | ||
total length | 278.06 m | |
span lengths | 73.50 m - 132.00 m - 73.50 m | |
number of spans | 3 | |
piers | diameter | 3.95 m |
superstructure | girder depth | 3.08 - 4.88 m |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Alternative design
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Entwicklungen im Brückenbau. In: Beton- und Stahlbetonbau, v. 73, n. 1 (January 1978), pp. 1-7. (1978):
- Ersatzneubau der Mainbrücke Mainflingen. Entwurf und BIM-Planung. In: Brückenbau, v. 12, n. 1-2 ( 2020), pp. 14-21. (2020):
- About this
data sheet - Structure-ID
20021385 - Published on:
05/05/2006 - Last updated on:
17/06/2020