General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Schwerte, Unna (Kreis), North Rhine-Westphalia, Germany |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Coordinates: | 51° 25' 9.17" N 7° 33' 2.51" E |
Technical Information
Dimensions
total length | 512.00 m | |
span lengths | 4 x 39.00 m - 55.00 m - 90.00 m - 55.00 m - 4 x 39.00 m | |
number of spans | 11 | |
total width | 31.25 m | |
deck | deck depth | 1.90 - 4.00 m |
Cost
cost of construction | ca. German Mark 8 300 000 |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Ruhrbrücken. Von der Quelle bis zur Mündung zwischen Einst und Jetzt. Ardey-Verlag, Münster (Germany), pp. 292-293. (2004):
- About this
data sheet - Structure-ID
20021323 - Published on:
05/05/2006 - Last updated on:
05/02/2016