General Information
Other name(s): | Windelbachtalbrücke |
---|---|
Beginning of works: | 1966 |
Completion: | 1969 |
Status: | under demolition |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
T-section girder bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Location
Location: |
Herborn, Lahn-Dill-Kreis, Hesse, Germany |
---|---|
Carries: |
|
Part of: | |
Replaced by: |
Windelbach Viaduct (2012)
|
Coordinates: | 50° 41' 48.48" N 8° 17' 36.09" E |
Technical Information
Dimensions
main span | 53.40 m | |
length | ca. 302 m | |
girder depth | 3.80 m |
Design Loads
live load | Brückenklasse 60 |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ertüchtigung von Großbrücken. Aufgaben und ausgeführte Beispiele. In: Brückenbau, v. 3, n. 1 ( 2011), pp. 80-84. (2011):
- Die Windelbachtalbrücke - Überbauerneuerung mit innovativem Montageverfahren. In: Stahlbau, v. 80, n. 10 (October 2011), pp. 761-774. (2011):
- About this
data sheet - Structure-ID
20021370 - Published on:
05/05/2006 - Last updated on:
05/02/2016