General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Multiple T-section girder bridge Rigid frame bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Hagen, North Rhine-Westphalia, Germany |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Replaced by: |
Lenne Viaduct (2021)
|
Coordinates: | 51° 22' 59.45" N 7° 31' 30.35" E |
Technical Information
Dimensions
total length | 985 m | |
number of spans | 22 | |
standard span lengths | 45.40 m | |
piers | deck depth at abutments | 21 |
Design Loads
live load | Brückenklasse 60 | |
design code(s) | DIN 1072 |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
deck slab |
prestressed concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20018110 - Published on:
15/10/2005 - Last updated on:
20/04/2023