General Information
Other name(s): | Talbrücke Kalteiche |
---|---|
Completion: | 1967 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Double-cell box grider bridge Multi-span continuous girder bridge |
Location
Location: |
Haiger, Lahn-Dill-Kreis, Hesse, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 50° 45' 37.23" N 8° 9' 29.12" E |
Technical Information
Dimensions
total length | 352.50 m | |
span lengths | 38.00 m - 44.25 m - 4 x 47.00 m - 44.25 m - 38.00 m | |
number of spans | 8 | |
bridge surface | 12 422 m² | |
Northern bridge | ||
---|---|---|
deck width | 19.32 m | |
Southern bridge | ||
deck width | 15.92 m |
Quantities
Rehabilitation | ||
---|---|---|
structural steel | 2 x 43 t | |
concrete volume | 2 x 375 m³ | |
reinforcing steel | 2 x 117 t | |
prestressing bars | 2 x 9.0 t | |
external prestressing | 21.50 t |
Design Loads
live load | Brückenklasse 60 | |
design code(s) | DIN 1072 |
Cost
Rehabilitation | ||
---|---|---|
cost of construction | Euro 6 640 000 |
Materials
deck |
prestressed concrete
|
---|
Case Studies and Applied Products
TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Initial construction (1967)
Owner
Client
Rehabilitation (2010-2012)
Owner
Client
Original design
- Hessen Mobil Straßen- und Verkehrsmanagement
- Ingenieurbüro Grassl GmbH Beratende Ingenieure Bauwesen
Structural engineering
Contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2014. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2014, pp. 103-114.
- About this
data sheet - Structure-ID
20021366 - Published on:
05/05/2006 - Last updated on:
05/02/2016