The following reports and case studies provided by "MAURER SE " are available:
Beautiful Bridge under Monitoring
How do loads really develop during the construction phase of a bridge? The planners in Madrid wanted to know precisely how and therefore asked MAUR ... [more]
168 Tonnes Mass Damp India’s Longest Sea Bridge
Spans of up to 180 metres make India’s longest sea bridge from the city of Mumbai to the harbour a challenge, since the bridge is made of steel. Th ... [more]
Hospital in Chile isolated with MSM®-SIP®-Bearings for the first time
For the first time, a hospital in Chile was isolated with Double Sliding Isolation Pendulums. The innovative building design is the outcome of inte ... [more]
Guided Cross-Tie: Highly innovative railway joint for extreme demands
Guided Cross-Ties are an innovative expansion joint system that has only been used on railway bridges a few times worldwide. The new Champlain Brid ... [more]
A Catamaran for the World’s Longest Suspension Bridge
Special Bearings for the Halfway River Bridge in Canada
Spherical bearings are not very widespread in Canada. However, high superimposed loads, a large temperature difference, and unusual challenges duri ... [more]
Seismic Retrofitting of Viaduct Piers
Colombia: Horseshoe shape of the Yarumo Blanco Viaduct challenges engineers.
[more]Luxury and Family Hotel in Mexico Stands on 410 Seismic Isolators
Double sliding isolation pendulum bearings reduce construction costs and secure hotel operations on the Pacific coast even during the strongest ear ... [more]
A lift bridge is lifted off its bearings
For the new Kattwyck Bridge and the older one it replaces as a railroad bridge, MAURER was responsible for the installation of the bearings. For th ... [more]
Complete expansion joint replacement in a single weekend
In just 57 hours, the expansion joints of a highway bridge near Augsburg were replaced. Of this, the freeway was fully closed for less than 6 hours ... [more]