Advertisement
MAURER SE
The following reports and case studies provided by "MAURER SE " are available:
Extreme heat, high contact pressure: new sliding material for Dubai
Dubai is known for its extreme and innovative structures – correspondingly high are the requirements of the Roads & Transport Authority. For the br ... [more]
Replacing pot bearings with spherical bearings in Vienna
500 years earthquake protection for Great Mosque of Algiers
The Great Mosque of Algiers (Djamaâ El Djazïr) will be the third biggest in the world and has to last for at least 500 years – at least theoretical ... [more]
Expansion joints for the Jianghai Bridge
Presently, the 35 km long Hong Kong-Zhuhai-Macao Bridge (HZMB) is being constructed over the Pearl River Delta. Since 2009 the HZMB is under constr ... [more]
Earthquake-Proof Pendulum Bearings for the Taro Bridge
For a new highway bridge near Parma, MAURER developed a tailor-made concept of pendulum bearings, lead rubber bearings, and modular expansion joint ... [more]
Triumphal Arch of Bucharest protected against earthquake
The industrial monument Triumphal Arch of Bucharest was subject to a complete overhaul and protected by means of seismic isolation against earthqua ... [more]
Zenit St. Petersburg's New Football Stadium
Hong Kong-Zhuhai-Macao Bridge resists laminar flows with Tuned Mass Dampers
Presently, and starting from Hong Kong, the 35 km long Hong Kong-Zhuhai-Macao Bridge is being constructed over the delta of the Pearl River. The br ... [more]
Izmit Bay Bridge: Suspension bridge with the world's fourth longest main span
The suspension bridge with the fourth longest main span in the world is currently being erected over the Izmit Bay. A particular challenge is the l ... [more]
Floating expansion joints for Europe’s largest lift bridge
Rotterdam has the largest port in Europe, so its port entrance for overseas container ships is both vast and congested. This is the entrance to wha ... [more]