Hospital in Chile isolated with MSM®-SIP®-Bearings for the first time
For the first time, a hospital in Chile was isolated with Double Sliding Isolation Pendulums. The innovative building design is the outcome of intense co-operation between structural planner, construction company and MAURER. The isolators significantly save costs, and the building can still be used in its entirety even following an earthquake.
Structure Types
- About this
data sheet - Product-ID
8037 - Published on:
13/04/2023 - Last updated on:
13/04/2023