General Information
Completion: | 1978 |
---|---|
Status: | in use |
Project Type
Structure: |
Double T-section girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Incremental launching |
Support conditions: |
for registered users |
Structure: |
Multi-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nice, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France |
---|---|
Carries: |
|
Part of: | |
Next to: |
Viaduc du Paillon (1986)
|
Coordinates: | 43° 43' 59.11" N 7° 17' 23.25" E |
Technical Information
Dimensions
total length | 350.6 m | |
span lengths | 23.6 m - 40 m - 7 x 41 m | |
number of spans | 9 | |
girder width | 0.85 m | |
abutments | number | 2 |
deck | deck depth | 3.10 m |
deck width | 12.40 m | |
number of longitudinal girders | 2 | |
piers | height | max. 22 m |
Quantities
deck | prestressing steel | 45 kg/m² |
reinforcing steel | 80 kg/m² |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A8 - Viaduc du Paillon. In: Bulletin annuel AFPC ( 1978- 1979), pp. 131-138.
- Evolution, récents développements et perspectives d'avenir des ponts poussés. Presented at: La technique française du béton. 8ème congrès FIP. Londres 1978 (AFB/AFGC), pp. 181-186. (1978):
- Viaducs du contournement autoroutier de Nice. Presented at: La technique française du béton. 8ème congrès FIP. Londres 1978 (AFB/AFGC), pp. 172-180. (1978):
- About this
data sheet - Structure-ID
20004636 - Published on:
22/08/2002 - Last updated on:
22/07/2019