General Information
Completion: | 1986 |
---|---|
Duration of works: | 15 months |
Status: | in use |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nice, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France |
---|---|
Carries: |
|
Part of: | |
Next to: |
Viaduc du Paillon (1978)
|
Coordinates: | 43° 43' 59.34" N 7° 17' 24.26" E |
Technical Information
Dimensions
total length | 364 m | |
span lengths | 29.1 m - 48.28 m - 40.9 m - 2 x 43.35 m - 41.1 m - 33.52 m - 45.4 m - 39 m | |
number of spans | 9 | |
pier height | 16 m | |
deck | deck depth | 2.5 m |
deck width | 11.4 m |
Quantities
deck | concrete volume | 7.55 m³/m (lin.) |
prestressing steel | 44 kg/m² | |
reinforcing steel | 150 kg/m² |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A8 - Doublement du viaduc du Paillon. In: Travaux, n. 606 (January 1986), pp. 73.
- About this
data sheet - Structure-ID
20007600 - Published on:
05/01/2003 - Last updated on:
22/07/2019