General Information
Name in local language: | Jauntalbrücke |
---|---|
Completion: | December 2023 |
Status: | under construction |
Project Type
Material: |
Steel-reinforced concrete composite bridge |
---|---|
Structure: |
Deck truss bridge |
Support conditions: |
for registered users |
Structure: |
Continuous truss bridge Parallel-chord truss bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Warren type truss bridge |
Construction method: |
Longitudinal launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: Railroad (railway) bridge lower deck: Bicycle and pedestrian bridge |
Location
Location: |
Ruden, Carinthia, Austria |
---|---|
Crosses: |
|
Replaces: |
Jaun Viaduct (1962)
|
Coordinates: | 46° 38' 50.87" N 14° 49' 6.21" E |
Technical Information
Dimensions
main span | 95.14 m | |
width | 13.10 m | |
total length | 428.26 m | |
span lengths | 78.66 m - 87.40 m - 95.14 m - 87.40 m - 78.66 m | |
number of spans | 5 | |
height above valley floor or water | 96 m | |
number of tracks | 2 | |
abutments | number | 2 |
piers | height | 60.45 - 76.85 m |
number | 4 | |
truss | height | 6.28 m |
Quantities
structural steel | 3 700 t | |
concrete volume | 7 000 m³ | |
reinforcing steel | 1 200 t | |
shear studs | 55 000 |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
Bearings Slid in Piggyback-Style
Once completed, the new railroad bridge over the Drava River in Carinthia, Austria, will function with a unique combination of sliding isolation pendulums and brake dampers. The load-bearing structure slides over the bearings for slow an ... [more]
Participants
Owner
Structural engineering
- KOB ZT GmbH (superstructure)
- ZKP ZT GmbH (substructure)
Checking engineering
Co-contractor
Steel construction
Bearings
Relevant Web Sites
- About this
data sheet - Structure-ID
20087069 - Published on:
27/09/2023 - Last updated on:
01/11/2023