Advertisement
Bridges and Viaducts: Case Studies
- Structures
- Bridges and Viaducts
Case Studies & Reports
The following reports and case studies on "Bridges and Viaducts" are available:
![](https://files.structurae.net/files/300x200/1/img_20221022_212938.jpg)
No smooth bridge construction without a suitable scaffolding erector
Specialist Gemeinhardt Service responds quickly and reliably when erecting the protective scaffolding for the Siligmüller Bridge in Würzburg.
more![](https://files.structurae.net/files/300x200/1/206-montreal-1.jpg)
Guided Cross-Tie: Highly innovative railway joint for extreme demands
Guided Cross-Ties are an innovative expansion joint system that has only been used on railway bridges a few times worldwide. The new Champlain Brid ... more
![](https://files.structurae.net/files/300x200/1/aftetal_01.jpg)
The bridge over the Afte near Bad Wünnenberg
Bridges are made to drive over them, preferably as quickly as possible; one never knows what could happen. There is even a technical term for it: g ... more
![](https://files.structurae.net/files/300x200/1/202_canakkale_1.jpg)
A Catamaran for the World’s Longest Suspension Bridge
![](https://files.structurae.net/files/300x200/1/bridge-01-copyright-smart-circular-bridge.jpg)
High-tech bridge built with flax
An old material is being rediscovered: flax has been with us for thousands of years in the form of clothing, sacks, and robust ship's ropes. Now th ... more
![](https://files.structurae.net/files/300x200/1/211-halfway-river-bridge-1.jpg)
Special Bearings for the Halfway River Bridge in Canada
Spherical bearings are not very widespread in Canada. However, high superimposed loads, a large temperature difference, and unusual challenges duri ... more
![](https://files.structurae.net/files/300x200/1/213-yarumo-blanco-1.jpg)
Seismic Retrofitting of Viaduct Piers
Colombia: Horseshoe shape of the Yarumo Blanco Viaduct challenges engineers.
more![](https://files.structurae.net/files/300x200/1/achse-60-1030x687.jpg)
Neckar valley bridge is moved much more cheaply thanks to special engineering idea
The Nuremberg engineering office K+S Ingenieur-Consult GmbH & Co. KG - in close cooperation with Hochtief Infrastructure GmbH and on behalf of ... more
![](https://files.structurae.net/files/300x200/1/208-kattwyk-2.jpg)
A lift bridge is lifted off its bearings
For the new Kattwyck Bridge and the older one it replaces as a railroad bridge, MAURER was responsible for the installation of the bearings. For th ... more
![](https://files.structurae.net/files/300x200/1/209-gersthofen-1.jpg)
Complete expansion joint replacement in a single weekend
In just 57 hours, the expansion joints of a highway bridge near Augsburg were replaced. Of this, the freeway was fully closed for less than 6 hours ... more