General Information
Other name(s): | U 55 Metro Line |
---|---|
Completion: | 21 December 1930 |
Status: | in use |
Project Type
Function / usage: |
Metro (Subway, Underground) Line |
---|
Location
km | Name |
0 | |
1 | |
1.900 | |
2.600 | |
3.400 | |
4.300 | |
5.700 | |
7.100 | |
8.200 | |
10.100 | |
11.300 | |
12.500 | |
13.200 | |
14 | |
14.800 | |
15.500 | |
16.100 | |
17 | |
17.800 | |
18.400 | |
22.400 |
Technical Information
Dimensions
length | 22.4 km | |
length | 1.8 km | |
number of tracks | 2 | |
number of stations | 26 | |
track gauge | 1 435 mm |
Case Studies and Applied Products
"Bärlinde" tunnel boring machine reaches Brandenburg Gate station
Implenia has been working since 2011 on the new U5 underground railway line for the Berlin Transport Authority (BVG). The project includes extending the existing U5 line from Alexanderplatz to the Brandenbur ... [more]
Participants
Relevant Web Sites
Relevant Publications
- Metro Line U5 in Berlin - design challenges due to complex geotechnical conditions / U-Bahnlinie U5 in Berlin - besondere Herausforderungen für die Planung aufgrund der komplexen geotechnischen Gegebenheiten. In: Geomechanics and Tunnelling, v. 6, n. 5 ( 2013), pp. 487-493. (2013):
- Zum Weiterbau der U-Bahnlinie U5 in Berlin-Mitte. In: Bautechnik, v. 89, n. 9 (September 2012), pp. 623-628. (2012):
- About this
data sheet - Structure-ID
10001052 - Published on:
21/03/2007 - Last updated on:
03/12/2023