0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: U-Bahnhof Unter den Linden
Beginning of works: 11 July 2010
Completion: 5 December 2020
Status: in use

Project Type

Structure: Underground structure
Construction method: Cut-and-cover method
Function / usage: Below grade metro or light-rail station

Location

Location: , , ,
Part of:
See also: Brandenburger Tor - Berliner Rathaus Metro Tunnel (2020)
Coordinates: 52° 31' 1" N    13° 23' 20" E
Show coordinates on a map

Technical Information

There currently is no technical data available.

Case Studies and Applied Products

"Bärlinde" tunnel boring machine reaches Brandenburg Gate station

"Bärlinde" tunnel boring machine reaches Brandenburg Gate station

Implenia has been working since 2011 on the new U5 underground railway line for the Berlin Transport Authority (BVG). The project includes extending the existing U5 line from Alexanderplatz to the Brandenbur ... [more]

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20062919
  • Published on:
    20/03/2012
  • Last updated on:
    21/08/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine