0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1985
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , , ,
Carries:
  • Autoroute A8
Part of:
Next to: Viaduc de l'Oli (1978)
Coordinates: 43° 43' 55.74" N    7° 18' 30.46" E
Show coordinates on a map

Technical Information

Dimensions

total length 624.2 m
span lengths 29.5 m - 24.2 m - 6 x 40.75 m - 8 x 40.75 m
number of spans 16
pier height max. 55 m
web thickness 0.40 - 0.69 m
deck deck depth 3.0 m
deck width 11.40 m

Quantities

concrete volume 5 300 m³
prestressing steel 195 t
reinforcing steel 780 t

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007601
  • Published on:
    05/01/2003
  • Last updated on:
    30/07/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine