0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): NBS Wendlingen-Ulm
Official designation: Streckennummer (DB) 4813
Beginning of works: 7 May 2012
Completion: December 2021
Status: under construction

Project Type

Function / usage: High-speed rail line

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

total length 61.3 km
number of bridges 11
number of tunnels 9

Design Loads

design speed max. 250 km/h

Cost

cost of construction Euro 1 514 000 000

Participants

Owner
Client
Section Albaufstieg
General designers

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    10000518
  • Published on:
    25/05/2004
  • Last updated on:
    20/07/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine