0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 8 April 2013
Completion: 2021
Status: under construction

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel
Construction method: Cut-and-cover method

Location

Location: , , ,
Part of:
Coordinates: 48° 31' 43.10" N    9° 42' 24.90" E
Coordinates: 48° 31' 35.70" N    9° 43' 10.20" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 962 m

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Merzagora, Eugenio A. / Sigismondo, Monica (2016): ICE sulle Schwäbische Alb. In: Strade e Autostrade, v. 20, n. 116 (March 2016), pp. 76-80.
  • About this
    data sheet
  • Structure-ID
    20067548
  • Published on:
    22/08/2015
  • Last updated on:
    30/08/2015
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine