0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2014
Completion: December 2022
Status: in use

Project Type

Location

Location: , , ,
Part of:
Coordinates: 48° 34' 15" N    9° 38' 46" E
Show coordinates on a map

Technical Information

Dimensions

track gauge 1 435 mm
Eastern bridge
main span 150 m
total length 472 m
span lengths 44 m - 95 m - 150 m - 88 m - 50 m - 45 m
number of spans 6
number of tracks 1
deck deck depth 2.80 - 4.65 m
Western bridge
main span 150 m
total length 485.00 m
span lengths 44 m - 95 m - 150 m - 93 m - 58 m - 45 m
number of spans 6
number of tracks 1
deck deck depth 2.80 - 4.65 m

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20012211
  • Published on:
    25/05/2004
  • Last updated on:
    07/05/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine