0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2 December 2012
Completion: 2018
Status: under construction

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel

Location

Location: , , ,
Part of:
Coordinates: 48° 34' 9.40" N    9° 38' 51.60" E
Coordinates: 48° 32' 2" N    9° 41' 5.70" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 4 847 m

Case Studies and Applied Products

The Albaufstieg: Tunnel construction for high speed rail line

The Albaufstieg: Tunnel construction for high speed rail line

The Stuttgart-Ulm railway project includes several major projects that will shift traffic from the roads to the rails. The existing, winding rail line south-east of Stuttgart over the Swabian Alb only allows ... [more]

Participants

Owner
Client
General designers

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20012213
  • Published on:
    25/05/2004
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine