• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Albvorlandtunnel

General Information

Beginning of works: 2016
Completion: mid of 2019
Status: under construction

Project Type

Structure: Tunnel with segmental lining
Function / usage: High-speed rail tunnel
Construction method: Tunnel boring machine (TBM)

Location

Location: , , ,
, , ,
, , ,
Part of:
Coordinates: 48° 39' 44.42" N    9° 22' 19.83" E
Coordinates: 48° 37' 47.32" N    9° 28' 4.97" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 8 176 m
number of tracks 2 x 1
number of tubes 2

Materials

tubbings precast reinforced concrete

Advertisement

Participants

Relevant Web Sites

Relevant Publications

  • Merzagora, Eugenio A. / Sigismondo, Monica (2016): ICE sulle Schwäbische Alb. In: Strade e Autostrade, v. 20, n. 116 (March 2016), pp. 76-80.
  • About this
    data sheet
  • Structure-ID
    20067543
  • Date created
    22/08/2015
  • Last Update
    07/06/2018