General Information
Completion: | 1953 |
---|---|
Status: | in use |
Project Type
Structure: |
Double T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Multi-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Untermarchtal, Alb-Donau-Kreis, Baden-Württemberg, Germany |
---|---|
Crossed: |
|
Replaced by: |
Donauviadukt Untermarchtal (2013)
|
Coordinates: | 48° 14' 27" N 9° 36' 16" E |
Technical Information
Dimensions
width | 11.4 m | |
height | 23 m | |
total length | 334 m | |
span lengths | 62 m -3 x 70 m - 62 m | |
number of spans | 5 |
Cost
Demolition | ||
---|---|---|
cost of demolition | Euro 3 850 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Initial construction
Owner
Client
Design
- Fritz Leonhardt (designer)
Demolition (2013-2014)
Owner
Client
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2015. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2015, pp. 8.
- About this
data sheet - Structure-ID
20065045 - Published on:
04/04/2013 - Last updated on:
24/04/2016