• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Wilhelm Zellner

Biographical Information

Name: Wilhelm Zellner
Place(s) of activity:

Structures and Projects

Participation in the following structures & large-scale projects:

checking engineer

Advertisement

Bibliography

  1. Zellner, Wilhelm / Barthel, Klaus (1996): Entwurf und Ausführung von Ingenieurbauwerken im Umfeld der Neuen Messe Leipzig. Presented at: 6. Dresdner Brückenbausymposium, Dresden, 14. März 1996.
  2. Saul, Reiner / Zellner, Wilhelm (1991): Combined highway-railway bridge with double composite action. Presented at: Bridges — Interaction between construction technology and design, IABSE Symposium, Leningrad, USSR 1991, pp. 141-146.

    https://doi.org/10.5169/seals-49287

  3. Zellner, Wilhelm / Saul, Reiner (1991): Enz viaduct: a 1044 m long prestressed concrete box girder bridge. Presented at: Bridges — Interaction between construction technology and design, IABSE Symposium, Leningrad, USSR 1991, pp. 512-513.

    https://doi.org/10.5169/seals-49360

  4. Zellner, Wilhelm (2000): Der Brückenbauer Friedrich Standfuß. In: Stahlbau, v. 69, n. 11 (November 2000), pp. 821-822.

    https://doi.org/10.1002/stab.200003100

  5. Leonhardt, Fritz / Zellner, Wilhelm (1980): Cable-Stayed Bridges. In: IABSE Surveys, v. 4 (February 1980), pp. 21-48.

    https://doi.org/10.5169/seals-45735

More publications...
  • About this
    data sheet
  • Person-ID
    1000965
  • Published on:
    04/08/2001
  • Last updated on:
    22/07/2014