0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Elbebrücke Torgau
Beginning of works: 1991
Completion: 1993
Duration of works: 19 months
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Elbe River
Replaces: Torgau Road Bridge (1880)
Coordinates: 51° 33' 30.32" N    13° 0' 46.81" E
Show coordinates on a map

Technical Information

Dimensions

total length 509.0 m
span lengths 16.0 m - 18.0 m - 20.0 m - 22.0 m - 16.00 m - 22.0 m - 53.0 m - 106.0 m - 65.0 m - 3 x 45.0 m - 36.0 m
number of spans 13
length of prestressed part 123.0 m
length of composite part 386.0 m
deck deck depth max. 5.40 m
deck width 15.5 m

Quantities

structural steel 1 435 t
concrete volume 11 415 m³
prestressing steel 69.5 t

Cost

cost of construction German Mark 30 050 000
cost of construction per m² German Mark 3 700

Materials

piers reinforced concrete
deck of main bridge composite steel-reinforced concrete
deck of approach viaduct prestressed concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001121
  • Published on:
    29/10/2000
  • Last updated on:
    29/12/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine