0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Elbebrücke Tangermünde
Beginning of works: December 1997
Completion: June 2001
Status: in use

Project Type

Awards and Distinctions

2006 entry  

Location

Location: , , ,
Crosses:
  • Elbe River
Coordinates: 52° 33' 54.81" N    11° 59' 6.03" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 435.00 m
span lengths 49.00 m - 51.00 m - 60.00 m -185.00 m - 60.00 m - 55.00 m - 19 x 49.00 m - 44.00 m
number of spans 26
arch span 185 m
bridge surface 20 100 m²
deck deck width 14.60 m
piles diameter of cast-in-place driven piles 61 cm

Quantities

deck structural steel 1 850 t
concrete volume 830 m³
concrete volume 12 000 m³
prestressing steel 680 t
reinforcing steel 150 t
reinforcing steel 1 200 t
substructure concrete volume 7 100 m³
reinforcing steel 560 t

Cost

cost of construction Euro 27 000 000

Materials

piers reinforced concrete
arch steel
deck of approach viaducts prestressed concrete

Chronology

December 1997

Construction begins.

June 2001

End of construction.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20001357
  • Published on:
    11/03/2001
  • Last updated on:
    19/01/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine