0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Temburong Bridge, Brunei - Design of two cable stayed bridges

Author(s):





Medium: journal article
Language(s): English
Published in: Bautechnik, , n. 3, v. 92
Page(s): 220-226
DOI: 10.1002/bate.201500013
Abstract:

The Temburong Bridge Project is a 30 km long dual two-lane highway crossing over the Brunei Bay. It will connect the relatively isolated Brunei district of Temburong to the other three Brunei districts. The main objective of the project is to stimulate economic growth in the Temburong region by connecting it to the country's airport and ports. The alignment crosses two navigation channels resulting in the need for two cable stayed bridges - the Brunei Channel Bridge (145 m main span) and the Eastern Channel Bridge (260 m main span).
The design of these cable stayed bridges is one of the first applications of the Eurocode to a fully concrete cable stayed bridge. Both cable stayed bridges draw on strong Islamic architectural influences from the region to form a tower shape that is unique and instantly recognisable.

Keywords:
cable-stayed bridge Eurocodes concrete ladder beam deck sea crossing
Available from: Refer to publisher

Structures and Projects

Structure Types

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/bate.201500013.
  • About this
    data sheet
  • Reference-ID
    10071642
  • Published on:
    17/03/2015
  • Last updated on:
    27/04/2015
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine