General Information

Beginning of works: April 2016
Completion: 17 March 2020
Status: in use

Project Type

Location

Location:
Part of:
See also: Brunei Channel Bridge (2020)
Coordinates: 4° 53' 11.12" N    115° 5' 0.56" E
Show coordinates on a map

Technical Information

Dimensions

total length 520 m
span lengths 130 m - 260 m - 130 m
number of spans 3
number of lanes 2 x 2
longitudinal slope ± 3.000 %
superelevation ± 2.500 %
deck girder depth 2.896 m
total width 30.2 m
pylon height 110.5 m

Materials

deck prestressed concrete
piers reinforced concrete
pylons reinforced concrete

Notes

The Eastern Channel Bridge is composed of a navigation span of 260m and 2 side spans of 130m. The deck is 30.2m wide (4 vehicle lanes) with transverse cross beams spaced at 4.90m and is supported on 2 High Damping Rubber Bearings (HDRBs) at the transition piers (P166 and P167). Pre-stress is introduced by post-tensioning to avoid tensile stress in the edge girder and cross beam. The stay cables which have Parallel Strand System are anchored in the edge girders and are supported by cable saddles installed on the towers. The towers curved A-shape legs with heights of 110.5m from the top of pile cap. The legs have a curved tapering ribbed section and are connected with infilled wall above the deck.

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20066999
  • Published on:
    27/04/2015
  • Last updated on:
    20/02/2024