0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Temburong Bridge, Brunei – Independent Design Check

 Temburong Bridge, Brunei – Independent Design Check
Author(s): , ,
Presented at IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, published in , pp. 2062-2069
DOI: 10.2749/222137815818359564
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.08 MB

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. For a...
Read more

Bibliographic Details

Author(s): (COWI A/S, Kongens Lyngby, Denmark)
(COWI A/S, Kongens Lyngby, Denmark)
(Othman & Associates, Brunei Darussalam)
Medium: conference paper
Language(s): English
Conference: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Published in:
Page(s): 2062-2069 Total no. of pages: 8
Page(s): 2062-2069
Total no. of pages: 8
Year: 2015
DOI: 10.2749/222137815818359564
Abstract:

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. For a project of this significance, an independent category 3 design check has been carried out of the tender design. The check includes structural and geotechnical verification of the 13km long marine viaduct, two cable-stayed bridges across the navigation channels, and three tunnels. The paper describes the objective and process of the independent design check. The checker provides comments to the design drawings and the design basis, and the designer provide replies. The checker has to set up completely independent analysis models. As an example, the finite element models of the pile foundation and the deck of the cable-stayed bridges is presented. For the cable-stayed bridges the construction process and the cable rupture analysis is discussed.

Keywords:
pile foundation Independent design check cable stayed bridge marine viaduct category 3 fixed link ladder beam deck

Structures and Projects