0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Temburong Bridge, Brunei – Independent Design Check

 Temburong Bridge, Brunei – Independent Design Check
Autor(en): , ,
Beitrag für IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, veröffentlicht in , S. 2062-2069
DOI: 10.2749/222137815818359564
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.08 MB

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. For a...
Weiterlesen

Bibliografische Angaben

Autor(en): (COWI A/S, Kongens Lyngby, Denmark)
(COWI A/S, Kongens Lyngby, Denmark)
(Othman & Associates, Brunei Darussalam)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Veröffentlicht in:
Seite(n): 2062-2069 Anzahl der Seiten (im PDF): 8
Seite(n): 2062-2069
Anzahl der Seiten (im PDF): 8
Jahr: 2015
DOI: 10.2749/222137815818359564
Abstrakt:

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. For a project of this significance, an independent category 3 design check has been carried out of the tender design. The check includes structural and geotechnical verification of the 13km long marine viaduct, two cable-stayed bridges across the navigation channels, and three tunnels. The paper describes the objective and process of the independent design check. The checker provides comments to the design drawings and the design basis, and the designer provide replies. The checker has to set up completely independent analysis models. As an example, the finite element models of the pile foundation and the deck of the cable-stayed bridges is presented. For the cable-stayed bridges the construction process and the cable rupture analysis is discussed.

Stichwörter:
Pfahlgründung

Bauwerke und Projekte