Temburong Bridge, Brunei - Design of two cable stayed bridges
Auteur(s): |
Alberto Carlucci
Martin Hooton Hj Mazlan Abd Salim Sammy Yip Kelvin Moneypenny Steve Kite |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Bautechnik, mars 2015, n. 3, v. 92 |
Page(s): | 220-226 |
DOI: | 10.1002/bate.201500013 |
Abstrait: |
The Temburong Bridge Project is a 30 km long dual two-lane highway crossing over the Brunei Bay. It will connect the relatively isolated Brunei district of Temburong to the other three Brunei districts. The main objective of the project is to stimulate economic growth in the Temburong region by connecting it to the country's airport and ports. The alignment crosses two navigation channels resulting in the need for two cable stayed bridges - the Brunei Channel Bridge (145 m main span) and the Eastern Channel Bridge (260 m main span). |
Mots-clé: |
Pont à haubans Eurocodes
|
Disponible chez: | Voir chez l'éditeur |
Ouvrages et projets
Types d'ouvrages
- Informations
sur cette fiche - Reference-ID
10071642 - Publié(e) le:
17.03.2015 - Modifié(e) le:
27.04.2015