-
Yip, Sammy / Hussain, Naeem / Vishnoi, Paresh (2023): Innovation in the design and construction of Temburong Bridge, Brunei. Présenté pendant: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023.
https://doi.org/10.2749/newdelhi.2023.0445
-
Yip, Sammy / Yeung, Ngai / Frederik, Kevin / Vernooij, Roel / de Meijier, Felix / Georgiadis, Konstantinos (2023): Bridge Specific Live Load for the Assessment of Tsing Ma Bridge and Lantau Link. Présenté pendant: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023.
https://doi.org/10.2749/istanbul.2023.0599
-
Hussain, Naeem / Yip, Sammy / Cain, John (2018): Brunei Temburong Link – Temburong Viaduct. Présenté pendant: Ninth International Conference on Bridge Maintenance, Safety and Management, IABMAS 2018, 9-13 July 2018, Melbourne, Australia.
https://doi.org/10.1201/9781315189390-379
-
Yip, Sammy / Hussain, Naeem (2023): Feasibility study and preliminary design of Bataan–Cavite interlink bridge, Philippines. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 176, n. 3 (septembre 2023).
https://doi.org/10.1680/jbren.22.00004
-
Yip, Sammy / Hussain, Naeem (2023): Feasibility Study, Detailed Design and Construction of the 27km Brunei Temburong Bridge. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 176, n. 3 (septembre 2023).
https://doi.org/10.1680/jbren.22.00003
-
Kite, Steve / Pitchforth, James / Yip, Sammy / Artejo, Paz / Galang, Gerardo Ramon (2021): Navigation clearance evaluation and marine simulations for the planning of new bridge spans. Présenté pendant: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021.
https://doi.org/10.2749/christchurch.2021.0581
-
Yip, Sammy / Kite, Steve / Vishnoi, Paresh / Venkatesha, Vikas (2021): Bataan-Cavite Interlink Bridge, Philippines – a new 32 km sea crossing. Présenté pendant: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021.
https://doi.org/10.2749/christchurch.2021.0029
-
Hussain, Naeem / Yip, Sammy / To, Murphy / Chin, Kok Kong / Ding, Lee Sing / Yat, Kheong Cheng (2018): Brunei Temburong Link. Présenté pendant: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018.
https://doi.org/10.2749/kualalumpur.2018.0047
-
Yip, Sammy / Kite, Steve / Leung, William / Carlucci, Alberto / Gainey, Catherine / Hooton, Martin (2018): Temburong Link – design of cable stayed bridges against extreme loading conditions. Présenté pendant: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018.
https://doi.org/10.2749/kualalumpur.2018.0609
-
Yip, Sammy / Kite, Steve / Vishnoi, Paresh / Venkatesha, Vikas (2020): Bataan-Cavite Interlink Bridge – Preliminary Design of the crossing. Présenté pendant: IABSE Conference: Risk Intelligence of Infrastructures, Seoul, South Korea, 9-10 November 2020.
https://doi.org/10.2749/seoul.2020.214
-
Kite, Steve / Yee, Kok On / Hussain, Naeem / Chin, Kok Kong / Yip, Sammy / To, Murphy (2014): Temburong Bridge, Brunei – A new 30km road link. Présenté pendant: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
https://doi.org/10.2749/222137814814068625
-
Hooton, Martin / Salim, Hj Mazlan Abd / Carlucci, Alberto / Yip, Sammy / Moneypenny, Kelvin / Kite, Steve (2014): Temburong Bridge, Brunei - Design of two cable stayed bridges. Présenté pendant: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
https://doi.org/10.2749/222137814814068445
-
Poon, Chi-Ho / Yip, Sammy / Vishnoi, Paresh / Hussain, Naeem / Cain, John (2015): Temburong Bridge, Brunei – CC4 Swamp Crossing in Temburong District. Présenté pendant: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015.
https://doi.org/10.2749/222137815818359573
-
Carlucci, Alberto / Hooton, Martin / Moneypenny, Kelvin / Yip, Sammy / Gainey, Catherine / Leung, William (2015): Temburong Bridge, Brunei – CC3 Navigation Bridges and Associated Viaducts. Présenté pendant: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015.
https://doi.org/10.2749/222137815818359591
-
Carter, Matthew / Yip, Sammy / Hussain, Naeem / Chin, Kok Kong / Ding, Lee Sing / Lim, Siew Long (2015): Temburong Bridge, Brunei. Feasibility Study. Présenté pendant: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015.
https://doi.org/10.2749/222137815818359582
-
Carlucci, Alberto / Hooton, Martin / Salim, Hj Mazlan Abd / Yip, Sammy / Moneypenny, Kelvin / Kite, Steve (2015): Temburong Bridge, Brunei - Design of two cable stayed bridges. Dans: Bautechnik, v. 92, n. 3 (mars 2015).
https://doi.org/10.1002/bate.201500013